Start a Project →
Start a Project →
PRODUCTION / TECHNICAL

The room, built and run properly.

Stage, scenic, LED, audio, lighting, cameras, playback and show control — specified as one technical environment and operated by one crew.

STAGELEDAUDIOLIGHTINGSWITCHINGSHOW CALL
S.01 / SCOPE

Inside technical production.

Stage and scenic build, LED walls, projection, audio, lighting, cameras, playback, switching, graphics and show calling.

Stage and scenic

Stage build, backdrops, set elements and branding fabricated and installed to a drawn plan, with load-in scheduled against the venue’s access window.

LED and projection

LED walls, confidence monitors and projection sized to the room’s throw distance and ambient light, with content mapped to the actual pixel canvas.

Audio

Speaker system design for the room shape, wired and wireless microphones, monitor mixes and a dedicated operator at front of house.

Lighting

Key lighting that works for both the audience and the camera, plus stage states, effects and the cue sequence to move between them.

Cameras and switching

Multi-camera coverage, vision mixing, graphics insertion and playback operated from one production position.

Show control

A show caller running the cue sheet — presenters, playback, lighting states, camera cut and audio, all cued from one script.

Power and redundancy

Power distribution, backup paths and spare units for the components that stop the show if they fail.

S.02 / PROOF

Footage from real deliveries.

Filmed on site by the same team that ran the room. Nothing here is stock.

FADA 13th Auto Retail ConclaveFADA · 2025
FADA Conclave at Taj PalaceFADA · New Delhi
World Homoeopathy Day 2025Ministry of AYUSH / CCRH · 2025
OCA General Assembly — Bharat MandapamOlympic Council of Asia · New Delhi
Yuho Netra Smartphone LaunchYuho
S.04 / RELATED
The Rest of the Chain

Rarely booked
on its own.

The stage feeds the cameras, the cameras feed the encode, and the encode is what the remote audience actually sees. Taking the chain from one team means one crew, one contract and no second vendor to brief between the links.

AWAITING BRIEF

Tell us the date
and the room.

Delhi NCR base · Pan-India execution · We reply within one working day.